Commonlands Community, Ithaca, NY This 144-unit residential townhouse community is nestled above the Six Mile Reservoir in Ithaca, NY. A winding road layout and housing cluster placement were planned to leave the property in its natural state, a primary goal of the developer. Construction build-out happened in less than five years. |
|
 |
|
Centennial Park, Corning, NY HUNT teamed with world-renowned architect Dan Kiley to create the heart of Corning's recreation area, Centennial Park. The fountain pictured is height controlled by a wind-sensing device. The lovely park was a gift from Corning Incorporated to the city of Corning. |
|
Watkins Glen Water Treatment Facility, Watkins Glen, NY This direct filtration water treatment facility was designed to treat water drawn directly from Seneca Lake. This completely automated facility is discussed in an article published in Clearwaters magazine.
|
  |
|
Canisteo Waste Water Treatment Facility, Canisteo, NY This project converted the outdated activated sludge treatment operation to a sequential batch reactor (SBR) process. Coupled with a very effective inflow and infiltration (I&I) project, this provided a cost-effective solution to a failing facility. An article in New York Rural Water Association's Aquafacts magazine discusses the conversion.
|
|
Canisteo Source Development & Water Storage, Canisteo, NY Required by statute to replace a two-million gallon open reservoir, the village asked HUNT to develop a previously started well and construct a one-million gallon, pre-cast, wire-wound tank. The tank is 80 feet in diameter and 26 feet high. To mitigate the view impact, the structure was nestled in a wooded area on the edge of the village. The total project included well development, well house, related water main and storage tank for $1.2 million.
|
  |
|
Erwin Well Development, Pump Station and Water Storage, Erwin, NY A tremendous growth cycle in Erwin pressed the limits of all its infrastructure, but sound planning (see Talk of the Towns magazine on Erwin Planning) kept them in pace. Pictured at left is their new 1.5-million gallon water tank under construction with an associated pump house.
|
Woods Edge Subdivision, Erwin, NY Woods Edge is a planned development on 79 acres which comprises 144 apartments, 16 townhouses and 78 single-family home lots. The former creek bed that remained in the central portion of the property and was surrounded by trees was maintained in the design to afford natural, mature separation of single-family homes from apartments. |
  |
|
|
| |
 |
|
Steuben Village Development, Erwin, NY Forty upscale duplex units, wrapped around the existing apartment complex, were developed on 18 acres of land in the heart of Gang Mills. This project represents the first zero lot line construction in Erwin. |
|
|